[1]
2024. Optimization of bridge construction project scheduling on the Jakarta - Cikampek II Selatan Package III Toll Road with the PERT (program evaluation and review technique) method (Case Study of PT. XYZ). Jurnal Teknologika. 14, 1 (May 2024), 37–48. DOI:https://doi.org/10.51132/teknologika.v14i1.360.