[1]
daniel, Imas Widowaty, Sutardjo and Daisy Ade Riany Diem 2022. ANALISA BEBAN KERJA PEMBUATAN LEMARI KACA ALUMUNIUM DENGAN PENDEKATAN METODE FULL TIME EQUIVALENT (FTE) (Studi Kasus : CV. Hitajaya Alumunium, Purwakarta. Jurnal Teknologika. 12, 2 (Nov. 2022), 246-253. DOI:https://doi.org/10.51132/teknologika.v12iNo 2.225.