[1]
Widowati, I., Aldi Kurniawan, Daisy Ade Riany Diem and Asep Hermawan 2024. Optimization of bridge construction project scheduling on the Jakarta - Cikampek II Selatan Package III Toll Road with the PERT (program evaluation and review technique) method (Case Study of PT. XYZ). Jurnal Teknologika. 14, 1 (May 2024), 37-48. DOI:https://doi.org/10.51132/teknologika.v14i1.360.