(1)
Widowati, I.; Aldi Kurniawan; Daisy Ade Riany Diem; Asep Hermawan. Optimization of Bridge Construction Project Scheduling on the Jakarta - Cikampek II Selatan Package III Toll Road With the PERT (program Evaluation and Review Technique) Method (Case Study of PT. XYZ). teknologika 2024, 14, 37-48.