1.
Optimization of bridge construction project scheduling on the Jakarta - Cikampek II Selatan Package III Toll Road with the PERT (program evaluation and review technique) method (Case Study of PT. XYZ). teknologika. 2024;14(1):37-48. doi:10.51132/teknologika.v14i1.360