Optimization of bridge construction project scheduling on the Jakarta - Cikampek II Selatan Package III Toll Road with the PERT (program evaluation and review technique) method (Case Study of PT. XYZ). (2024). Jurnal Teknologika, 14(1), 37-48. https://doi.org/10.51132/teknologika.v14i1.360