[1]
“Optimization of bridge construction project scheduling on the Jakarta - Cikampek II Selatan Package III Toll Road with the PERT (program evaluation and review technique) method (Case Study of PT. XYZ)”, teknologika, vol. 14, no. 1, pp. 37–48, May 2024, doi: 10.51132/teknologika.v14i1.360.