Widowati, Imas, Aldi Kurniawan, Daisy Ade Riany Diem, and Asep Hermawan. “Optimization of Bridge Construction Project Scheduling on the Jakarta - Cikampek II Selatan Package III Toll Road With the PERT (program Evaluation and Review Technique) Method (Case Study of PT. XYZ)”. Jurnal Teknologika 14, no. 1 (May 31, 2024): 37-48. Accessed December 24, 2025. https://jurnal.wastukancana.ac.id/index.php/teknologika/article/view/360.