1.
Optimization of bridge construction project scheduling on the Jakarta - Cikampek II Selatan Package III Toll Road with the PERT (program evaluation and review technique) method (Case Study of PT. XYZ). teknologika [Internet]. 2024 May 31 [cited 2026 Sep. 22];14(1):37-48. Available from: https://jurnal.wastukancana.ac.id/index.php/teknologika/article/view/360